Cookies

We use essential cookies to make our site work. We'd also like to set analytics cookies that help us make improvements by measuring how you use the site. These will be set only if you accept.

For more detailed information about the cookies we use, see our cookies page.

Essential Cookies

Essential cookies enable core functionality such as security, network management, and accessibility. For example, the selections you make here about which cookies to accept are stored in a cookie.

You may disable these by changing your browser settings, but this may affect how the website functions.

Analytics Cookies

We'd like to set Google Analytics cookies to help us improve our website by collecting and reporting information on how you use it. The cookies collect information in a way that does not directly identify you.

Third Party Cookies

Third party cookies are ones planted by other websites while using this site. This may occur (for example) where a Twitter or Facebook feed is embedded with a page. Selecting to turn these off will hide such content.

Skip to main content

20A – 24V Uninterruptable Power Supply

The conflict in Afghanistan has led to a massive increase in the demand for electrical power in battlefield theatres. One of our customers specialises in the provision of Uninterruptible Power Supplies (UPS) for mission critical equipment such as perimeter defence.

The UK MoD DLO recently instructed R E Thompson's customer to proceed with an Urgent Operational Requirement (UOR) which required a UPS to be delivered and tested in a very short time. In addition, previous UPS built by our customer were typically indoor units, and therefore did not need the high levels of insulation from the elements. This unit did - and it was to be the largest UPS the customer had ever built for the MoD.

R E Thompson worked with the customer's design team to produce an IP65 unit which would be capable of meeting all the functional and environmental requirements. The joint R E Thompson-customer team also had to meet a number of physical requirements such as not exceeding the weight limit for a two man lift. The design that was jointly reached is as per the images as shown below.

The customer duly delivered the first units to the UK MoD to ship to theatre in another two weeks, beating the very ambitious target set at the start of manufacture.

Since then the units have performed flawlessly with the UK and US military in-theatre and is being evaluated by the Canadian and Australian armed forces for similar applications.