Residents Information
You will find here up to date information for all villages:
Road Closures -
- TOWN STREET Road closure for Northern Powergrid fuse upgrade works 18-26 January 2027. Access will be maintained for residents as there is no diversion route available.https://one.network/?tm=GB153729866
- GRANGE CLOSE 25-26 November Resurfacing of top end Working hours 17:00 to 23.59
- CUT THROAT LANE 6 December 25m of fibre for comms
- MILL BANK 4-8 December Possible delays for safe working
- COLBER LANE 14-16 December Manhole repairs
- TOWN STREET 18-26 January Northern Power grid fuse upgrade - More details can be found at Causeway one.network, allow the site to know your location and search with date parameters
Regulation -
SUNNY BANK Disabled parking bay - From a point 20.1m West of the centre line of the Track situated to the West of 5 Mill Bank Terrace, measured along the Northern kerb Line, to a point 6.6m away in a Western Direction.
A copy of the draft Order for this bay, together with a map showing the road affected and a statement of the Council's reasons for proposing to make the Order, may be inspected at Harrogate Library, Victoria Avenue, Harrogate to 03 December 2026 and also viewed online at www.northyorks.gov.uk/roadworks-map or www.northyorks.gov.uk/traffic-regulation-orders. If you wish to object to the proposed Order, you should send the grounds for your objection, in writing, addressed to Area 6 Boroughbridge Highways Office, Stump Cross, Boroughbridge, York YO51 9HU or by email to Area6.Boroughbridge@northyorks.gov.uk or via the website link above by 03 December 2026.